Matthys Potgieter, Alexandria, Eastern Cape, South Africa

Installation Date:1 May 2011
Purpose:To pump water out of borehole. The water is pumped into a reservoir. When the reservoir is full, the water over flows into a pond where crocodiles live.

Case Study:

One Kestrel e300i (1kW) Waterpumping System with Grundfos SQ Flex 2.5/2 pump.
Depth of borehole: 110m;
Water head: 85m